Global Power Supply provided an upgrade to an administrative headquarters with a new MTU 2.5MW emergency standby diesel generator into a Tier 2 emissions required sound attenuated enclosure with all switchgear and integrated fuel storage base tank.
Our asset recovery solution took ownership of existing Caterpillar gensets coordinating removal and transportation for all units.
This installation into a commercial facility took just under 3 months from ground breaking to start up and commissioning. A great example of having GPS as your single source solution for turnkey fast track projects.
Watch the 1 minute time lapse of a GPS custom engineered backup power solution from the arrival to each component getting installed. Check it out!
Contact Global Power Supply today to get expert assistance from a single source to fast track your generator projects. Buy with confidence.